Over the years, we have constructed a variety of projects and solved a number of problems. Here you can examine some of our symbolic sites which we are most proud of
Performed activity: Supply and construction of HVAC VRF installation Return on investment: 36 months Location: Plovdiv Customer since: 2019
Performed activity: Design, supply and installation of ventilation chambers with multi-stage recuperation. Average energy recovery 50% at 200kW consumption. Specific industrial HVAC solutions Return on investment: 10 months Location: Asenovgrad Customer since: 2013
Performed activity: : Reengineering of HVAC installations. Reconstruction of ventilation chambers with switching to recuperation of up to 50%. Introduction of heat pumps capacities, 640 kW. Hydraulic balance of installations Return on investment: 18 months Location: Hisarya Customer since: 2016
Performed activity: Complete construction of HVAC installation with 2 and 3 pipe VRV system. Ventilation installation. Construction of automation for general control between VRV and ventilation chambers Return on investment: 24 months Location: Plovdiv Customer since: 2016
Performed activity: Design and construction of regenerative ventilation installation Return on investment: 24 months Location: Harmanli, Radnevo, Dimitrovgrad, Pazardzhik, Panagyurishte, Berkovitsa, Vratsa, Razlog Customer since: 2008
Performed activity: Hydraulic balance of HVAC installations Return on investment: 36 months Location: Nessebar Customer since: 2016
Performed activity: Design, supply and installation of HVAC equipment. Reengineering, specific industrial HVAC solutions Return on investment: 12 months Location: Plovdiv Customer since: 2009
Performed activity: Design , supply and installation of HVAC installation. VRV and ventilation installations Return on investment: 36 months Location: Plovdiv Customer since: 2012
Performed activity: Full Hydraulic Balance of HVAC Installations Return on investment: 24 months Location: Ruse Customer since: 2010
Performed activity: Construction of air conditioning installations with air/water chiller, floor heating, ventilation installations of kitchens, swimming pools, etc., Construction of installations with solar collectors Return on investment: 36 months Location: Plovdiv Customer since: 2010
Performed activity: Reengineering of HVAC installations. Complete construction of HVAC installations with recuperation of over 50%. Thermodynamic recuperation to a pool ventilation installation Return on investment: 36 months Location: Hisarya Customer since: 2011
Performed activity: Engineering and waste heat survey in breadmaking. Design and construction of a two-stage recuperation chamber for absorbing waste heat Return on investment: 8 months Location: Velingrad Customer since: 2013
Performed activity: Investigation and reengineering of HVAC installations. Reconstruction of a heat-cold center. Hydraulic balance of HVAC installations Location: Sofia Customer since: 2014
Performed activity: Design , supply and installation of ventilation chambers with multi-stage recuperation. Specific industrial HVAC solutions Return on investment: 10 months Location: Asenovgrad Customer since: 2012